Power Transmission Lines

In the field of cultural heritage protection, the LayerCo team has also worked on power transmission line projects, including those implemented with funding from the Municipal Development Fund.

At the initial stage, our task was to survey buffer zones of 100 meters, as well as to thoroughly study the placement of pylons and their visual protection zones. The goal was to determine whether the pylons would fall within the legally defined physical or visual protection areas of cultural heritage monuments in Georgia.

Following the required studies, we prepared final reports that included risk assessments along with cultural heritage monitoring and protection plans.